Foreclock. Always prepared.
Building equipment deadline intelligence

Every building has hidden expiration dates.

Foreclock inventories your critical building systems, finds the deadlines hidden inside them, prices each one and tracks every fix through to verified completion.

BUILDING CONTROLS2038 date limit: review ELEVATOR PHONECopper line dependency ACCESS CONTROLSoftware support ending FIRE ALARM PANELSupport discontinued ELEVATION / MAIN CAMPUS / CRITICAL SYSTEMS
Illustrative drawing.
We do the first inventoryNo spreadsheet needed to start
Every finding sourcedConfirmed or flagged for review
Tracked to verified fixFound, budgeted, fixed, verified
Fully independentWe do not sell or install equipment
01 / The problem

Equipment that looks fine can still be running out of time.

Building condition assessments are visual. They catch wear and damage. They do not catch deadlines hidden inside equipment that appears to work perfectly.

TYPE A

Copper phone lines are being retired

Elevator emergency phones, fire alarm dialers and security panels that rely on copper lines can go silent when the line is cut, often with no warning on site.

TYPE B

Manufacturer support ends

Fire panels, access control and building controllers lose software updates and replacement parts on dates set by their makers, years before the equipment wears out.

TYPE C

Built-in date limits are coming

Some older equipment software cannot count past certain dates in 2036 and 2038. Affected devices may misread the date, reject certificates or fail scheduled tasks.

02 / The calendar

The deadlines are already set. The only question is whether you see them in time.

Now

Copper retirements

Carriers are retiring copper phone lines area by area. Life-safety devices that dial out are exposed.

Every year

End-of-support notices

Manufacturers announce end-of-support and end-of-parts dates for panels and controllers.

Feb 7, 2036

Network time rollover

Older devices that set their clocks from network time may jump to the wrong date.

Jan 19, 2038

32-bit date limit

Devices that store time as a 32-bit number run out of dates and can fail.

03 / Process

From first walk-through to verified fix, every step is tracked.

Most institutions do not have a clean list of their critical equipment. So we build it with you, then track every finding until it is closed.

STEP 01

Inventory

We build your system list from records, contractor service reports and photos of equipment labels.

Foreclock
STEP 02

Check deadlines

Each system is matched against copper retirements, support dates and known date limits.

Foreclock
STEP 03

Prioritize and price

Every finding gets a risk level, a due date, an estimated cost and its source.

Foreclock
STEP 04

Budget and plan

Costs flow into your capital plan. We help write the replacement scope.

Your team
STEP 05

Fix

Your contractors do the work. We can help compare bids. We never sell equipment.

Your contractors
STEP 06

Verify and watch

Upload the invoice or photo, we confirm the fix, and we keep watching for the next deadline.

Foreclock

You do not need a spreadsheet to start. In your first assessment we build the inventory for you. After that, your team keeps it current in the platform and we keep watching.

Automated discovery

Most of the inventory builds itself. A person verifies every result.

01

Photo of the label

Staff snap equipment nameplates with a phone. We read the maker, model, serial number and date automatically.

02

Your existing paperwork

Upload fire alarm and elevator inspection reports, service contracts and invoices. We pull out every system they mention.

03

Phone bills

Copper lines on carrier bills are matched to the elevators and panels they serve.

04

Network scan

With IT approval, a read-only scan finds connected building controllers and their software versions.

05

Public records

Permit and elevator registration data show what each building should have, so gaps stand out.

04 / Platform

One place for facilities, risk and finance to see what is coming.

What your team sees, and what our analysts work in behind the scenes.

Foreclock portfolio dashboard showing systems tracked, open findings, deadlines by year and buildings, with sample data Foreclock system record for a fire alarm control panel with nameplate photo, matched deadlines and analyst review, with sample data Foreclock fix tracker board with findings moving from found to verified, with sample data

Portfolio dashboard. Every building, every deadline and the total cost to fix, in one view for facilities, finance and leadership.

System record. Behind every finding: the nameplate photo, equipment details, the deadlines it matched, the source for each one and an analyst sign-off.

Fix tracker. Each finding moves from found to budgeted, contractor selected, fixed and verified, with an owner and a due date.

Product screens with illustrative sample data. Not a real customer.
05 / How we work

Start with an assessment. Stay ahead with the platform.

Start here

Building assessment

A fixed-scope, fixed-price engagement for one building or an entire campus.

  • We build your first inventory
  • Deadline check on every critical system
  • Priced, prioritized report
  • Briefing for leadership and finance
Ongoing

Platform subscription

Your inventory, deadlines and fixes in one place.

  • Alerts as deadlines approach
  • Fix tracking to verified completion
  • Capital plan and board reports
  • Records ready for lenders and insurers
Optional

Hands-off service

For owners who want us to handle the walk-throughs.

  • Periodic site visits with partner firms
  • Inventory kept current for you
  • Help comparing contractor bids
  • Still independent of equipment sales
06 / Who we serve

Built for institutions that cannot afford surprises.

Hospitals and clinicsNurse call, fire and life safety, building systems
Colleges and schoolsCampus emergency phones, fire alarms, door access
Senior living communitiesEmergency call systems and resident safety
Offices and commercial buildingsBuilding controls, elevators, access control
Banks and credit unionsBranch alarms and equipment support dates
Lenders and insurersEquipment deadlines that fall within a loan or policy term
Book an assessment

Find out what is expiring in your buildings before it becomes an emergency.

Tell us about your buildings. We will reply within two business days with a scope, a timeline and a fixed price.

Request an assessment